Thursday, October 9, 2008

The Basement- A Work in Progress....

Ok, so these will all be BEFORE pictures... Needless to say, the basement needed quite a bit of work.... Drew worked pretty much every day in the last couple of months since we've moved in order to get the ceiling ready to be drywalled (electrical, insulation, demo, ripping up carpet, etc). The drywall is now done, but the basement is pretty dusty and messy. We hope to be painting this weekend and flooring the following weekend (in the main room), so I will post the AFTER pictures sometime soon!!
This is a view of the main room in the basement ... We will use this as a rec room (bar, pool table, furniture with tv, etc). There are three "usuable" rooms off of this room (the other doors are storage areas). The door straight ahead in this picture will be my scrapbook room/future office and there are two doors off to the right. One of these rooms will eventually be a spare bedroom and bathroom, and the other will be Evan's playroom. We have decided to wait a little while to finish these 3 rooms, but hopefully they'll be done within the next year or so...
This was the bar that was here... We're going to redo it.. Paint and put a new countertop on it...
Another view of the main room... The door at the left is the door that looks out into my parent's backyard...
The spare bedroom (We did have the ceiling and walls of this room drywalled- even though we won't finish it right away). The other two rooms will eventually have drop ceilings.
Looking into the bathroom from the spare bedroom....
The spare bedroom.... Still needs a lot of work!
Evan's playroom....

1 comment:

  1. I can't believe everything you guys have done already. Your house is gorgeous!! Thanks for sharing all those great pics.

    ReplyDelete